Anhui Xinyuan Packaging Technology Co., Ltd.
Kuæa>Proizvodi>Qinghai Automatic Water Soluble Production Equipment
Qinghai Automatic Water Soluble Production Equipment
Qinghai Fully Automatic Water Soluble Production Equipment Classification Powder Water Soluble Equipment, Humic Acid Water Soluble Equipment, High Ele
Detalji proizvoda

Qinghai Automatic Water Soluble Production Equipment

Kategori

Powder water soluble equipment, humic acid water soluble equipment, large element water soluble equipment, water agent water soluble equipment, water soluble semi-automatic equipment, water soluble fertilizer processing equipment, water soluble packaging sealing equipment, water soluble mixing equipment, particle water soluble equipment, amino acid water soluble equipment, organic particle water soluble equipment, potassium humate water soluble equipment, solid water soluble equipment, humic acid water soluble equipment, marsh water soluble equipment, microbial water soluble production equipment, new water soluble equipment, etc.

Qinghai Automatic Water Soluble Production EquipmentLɔ̈k tɛ̈n, luɔɔi, ku tɛ̈n
1. Luɔi:
Raw materials to be put into storage from the feed port (including pulse dust removal system) <unk> static weighing <unk> mixer <unk> excess storage <unk> pneumatic conveying <unk> into excess storage (including horizontal spiral feeding system) <unk> transitional storage <unk> packaging machine
2. Ajuiɛɛr:
3 set de bak ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye
Pulse dust removal device 3 set
1m3 Raw Material Warehouse (Vibration Mechanism and Downloading Gate Control System) 5 set
0.5m3 Raw Material Warehouse (Vibration Mechanism and Downloading Gate Control System) 1 set
Premixed excess storage 1 set
0.5m3 screw type mixer (pre-mixed with pulse dust removal device) 1 unit
Spiral feeder 6 set
Static weighing system (with bracket) 2 set
1m3 screw-type mixer (platform bracket) 1 set
2m3 tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r
Pneumatic conveying system 1 set
25 square pulse dust removal system 1 set
2m3 tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r
Kabinet de kontrol 1 set
(a) Käke
1. Kuen ye looi:
6 buffer depot (kɔnɔ depot dust remover ku bag station), 2 static ingredient scale, 6 feeding spiral, 1 mixer, 3 buffer depot, 1 set of pneumatic conveying equipment. 1 pre-mixer mixer, pre-mixer mixer's feeding port has an artificial feeding buffer, artificial feeding buffer's top level is consistent with other materials warehouses. 1 pre-mixer mixer, pre-mixer mixer's feeding port has an artificial feeding buffer, artificial feeding buffer's top level is consistent with other materials warehouses.
2, ingredients, doping system design, manufacturing, installation, including platform, support, etc. 2, ingredients, doping system design, manufacturing, installation, including platform, support, etc. 2, ingredients, doping system design, manufacturing, installation, including platform, support, etc. Process flow chart, operating procedures, electrical, and instrument control chart. Kuen de luɔɔi, luɔɔi de luɔɔi, luɔɔi de luɔɔi, luɔɔi de luɔɔi, luɔɔi de luɔɔi.
3, chain control system design, buffer material warehouse output, static scale in, out, mixer in, out and achieve automatic ingredient mixing electrical appliances, instrument chain control system design. 3, chain control system design, buffer material warehouse output, static scale in, out, mixer in, out and achieve automatic ingredient mixing electrical appliances, instrument chain control system design.
4, depot dust remover supply range: use electromagnetic pulse dust remover, gas through the dust remover filter the material particles in the gas, material particles return to the depot for reuse. 4, depot dust remover supply range: use electromagnetic pulse dust remover, gas through the dust remover filter the material particles in the gas, material particles return to the depot for reuse.
5, doping system is a total package engineering, the demand party needs to manufacture doping system foundation and doping main steel platform after doping, the supplier is responsible for doping system equipment and electrical, instrumentation installation. 5, doping system is a total package engineering, the demand party needs to manufacture doping system foundation and doping main steel platform after doping, the supplier is responsible for doping system equipment and electrical, instrumentation installation.

Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!