Pulse lock, EM / IC card reader, door magnet integrate together, with its comprehensive functional features and external door control machine combined to form an intelligent safety "entry and exit" control system lock body selecting electronic control pulse lock, easy installation, can achieve a special installation requirements control circuit intelligent design. Pulse lock, EM / IC card reader, door magnet integrate together, with its comprehensive functional features and external door control machine combined to form an intelligent safety "entry and exit" control system lock body selecting electronic control pulse lock, easy installation, can achieve a special installation requirements control circuit intelligent design.
Wɛɛr:
A be luui në ɣän kɔ̈k peei yiic, ɣän kɔ̈k peei yiic, ɣän kɔ̈k peei yiic, ɣän kɔ̈k peei yiic, ɣän kɔ̈k peei yiic, ɣän kɔ̈k peei yiic.
|
Size |
129MM (kaam) X 104MM (kaam) X 40MM (kaam) ±5% |
|
Kolor |
Grey |
|
Net Weight |
1030g±10% (ka tɛ̈n yenë kɔc ye tɔ̈ɔ̈u thïn, ka tɛ̈n yenë kɔc ye tɔ̈ɔ̈u thïn) |
|
Power |
Voltage ye looi: 12VDC Voltage ye looi: 10.8VDC-13.2VDC Tɛ̈n yenë yen luui thïn: ye tɛ̈n yenë yen luui thïn: 30-60mA; ye tɛ̈n yenë yen luui thïn: ye tɛ̈n yenë yen luui thïn: 1.5A Minimum supply current: 1800mA/12VDC when input |
|
Temperatur |
0 ℃ ~ 50 ℃ tɛ̈n |
|
-20 ~ 60 ℃ tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n |
|
|
Humidity |
20% ~ 90% RH tɛ̈n ye luui |
|
20-90% tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n |
|
|
Tɛɛr |
Tɛ̈n software settings, piny green light |
|
Lifetime |
100 000 ye |
|
Distance kaar kuɛn |
40~80mm ((EM) 卡) |
|
Kuen kaar |
CHD1100 Kuen ID Card Serial Number CHD1100M Kuen MIFARE-1 kaar serial number CHD1100M-SZ ye MIFARE-1 card sector kuɛn |
|
Ways of Communication (Ways of Communication) |
RS485 ye gam; Lööŋ ke National Telecommunication Administration: YDN023<unk>1996; Format de habar: 1, 8, 1, N。 |
|
Indicateur de résistance |
Electrostatic discharge (ESD): contact discharge ±6KV air discharge ±8kV |
|
Application Scenario |
Model Produk |
Nomor |
Unit |
|
Operator base station access |
Integrated Reading Card Pulse Lock CHD1100/M |
1 |
Lɔ |
|
Switch Power CHD-PS4812 |
1 |
Taiyi |
|
|
Button de sortie |
1 |
a |
|
|
485 Converter CHD485HVD |
1 |
a |
|
|
IC/ID卡 |
A dɔw |
Zhang |
Wiring definition:
|
Pin order |
Luɔr lead |
Signal definition |
|
Piŋ fɔlɔ |
Red |
+12V |
|
Piŋ II |
Black |
GND |
|
3rd Foot |
Purple |
Magnet dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r (low level effective) |
|
4th Foot |
Yellow |
Button ye bɛ̈n (High Level Unlock) |
|
Pii 5 |
Brown |
RS485A+ |
|
Pi 6 |
Grey |
RS485B- |
|
Sap 7 |
Green |
Duniɛ |
Wɛɛr install
Doors switch ye looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi, looi

Në ye mɛn, a ŋic lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ Nɛ̈n ye kɛ̈ɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k ye kɛ̈k:

Inside, outside unlock Lock head turning direction diagram
Lɔ̈k ba tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈
Installation steps
(1) Lɔ̈k tɛ̈n yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen (Install hole map with product packaging) (Lɔ̈ɔ̈ŋ tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
(2) Rotate face cover screw, take the bottom cover; Ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ

(3) Lɔ̈k lock core, read card coil, and internal lock body në ɣän cï kek looi. Tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈
Note: Lɔ̈ɔ̈m kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k A tɛ̈n koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor A dɔɔni dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni ye dɔɔni.
(4) Na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen, na ye tɔ̈u yen.
(5) Na cï dhɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈
(6) Lɔ̈ɔ̈m dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r
(7) Kä ye kek looi ku kä ye kek tääu aye nyuɔɔth:

(8) N'a tɛ̈n yenë wɛ̈ɛ̈r de wɛ̈ɛ̈r de wɛ̈ɛ̈r de wɛ̈ɛ̈r de wɛ̈ɛ̈r de wɛ̈ɛ̈r de wɛ̈ɛ̈r de wɛ̈ɛ̈r de wɛ̈ɛ̈r de Ka tɛmɛ yen ye kë ye cɔl lock quality problem ye, ka lock ye waar.
(9) Lɔ̈k tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈
3、 Luɔi
(1) Tɛ̈n yenë yen tääu thïn, ka tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ
(2) Lock body install in open air environment should pay attention to the coil waterproof ring and lock body waterproof mat; 2) Lock body install in open air environment should pay attention to the coil waterproof ring and lock body waterproof mat; 2) Lock body install in open air environment should pay attention to the coil waterproof ring and lock body waterproof
(3) Fɔlɔ̈ɔ̈m ka lock core tääu, ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛ Kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl ye kɔl
(4) Tɛ̈n yenë kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye k
(5) Lɔ̈ɔ̈m ye kɔrɔ̈ŋ ye kɔrɔ̈ŋ ye kɔrɔ̈ŋ ye kɔrɔ̈ŋ ye kɔrɔ̈ŋ ye kɔrɔ̈ŋ ye kɔrɔ̈ŋ ye kɔrɔ̈ŋ
(6) Tɛ̈n yenë kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye k
|
Proyek |
Wël |
Nomor |
Kommentar |
|
1 |
Lock body |
1 ye |
|
|
2 |
Lock |
1 ye |
|
|
3 |
Lock latch |
1 ye |
|
|
4 |
Antenna coil |
1 ye |
|
|
5 |
Coil waterproof ring |
1 ye |
|
|
6 |
Cross Lock |
1 ye |
|
|
7 |
Key |
3 ye |
|
|
8 |
7 Eye Plate |
1 blok |
|
|
9 |
Lock core waterproof sheet |
2 ye |
|
|
10 |
M3*4 ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r |
2 ye |
|
|
11 |
M4*10 ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan |
9 ye |
|
|
12 |
M4*30MM ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc |
4 ye |
|
|
13 |
Lɔ̈k Sticker |
1 foto |
|
|
14 |
2P/4P man head connector cable |
Article 2 |
2P/4P |
|
15 |
Lock body waterproof ring |
2 ye |
|
|
16 |
Coil waterproof ring |
1 ye |
|
|
17 |
Ribbon |
Article 2 |
|
|
18 |
Thermal shrinkage |
Article 2 |
|
|
19 |
Wël ë luɔɔi |
1 wargak |
|
|
20 |
Garanti |
2 foto |
Chinese English 1 ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye |
|
21 |
Pɛl ye kek looi (Z&L-004) |
1 ye |
|
Fɔlɔ̈ɔ̈m, yïn tɛ̈ɛ̈r yïn tɛ̈ɛ̈r yïn tɛ̈ɛ̈r yïn tɛ̈ɛ̈r yïn tɛ̈ Walisa yïn ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ
A.Paket wɛ̈t:
1. after our company's products sold, in one month occurred due to non-human factors caused damage and affect normal use, in the product accessories complete, packaged perfectly, the appearance is not damaged in case, our company implemented package change manufacturing, belonging to the package change period of products such as appearing manufacturer stopped production or missing stock more than one week, your company can choose according to the purchase price to replace the same function, the same configuration of equivalent products (sold products' factory date according to our company's product factory label, tear coating change is not valid).
2. after our company's products sold, in three months the occurrence of non-human factors caused by damage due to normal use, our company is responsible for not exceeding three working days to repair at the right time (not counting on the way time), if not able to repair at the right time or repair products in one month again occurred the same defect, our company will implement package replacement manufacturing. Lɔ̈ɔ̈i de kä ye kek tɔ̈ɔ̈u thïn acï bɛ̈n ya looi në (1) de löŋ de löŋ de löŋ de löŋ de löŋ de löŋ de löŋ de löŋ de löŋ de löŋ de löŋ de löŋ de löŋ de löŋ
II.Terms of Repair(Wël kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k):
1.After our company's products sold, if in the quality assurance period occurred due to non-human factors caused damage due to normal use, our company is responsible for free repair, repair time does not exceed three working days (not counting the journey time), the defective products' return and return shipping costs are borne by our company (quality assurance time is based on the two parties' signed order contract or cooperation agreement, below).
2.In the quality guarantee period, if the customer's incorrect operation or human factors caused damage and external interference damage situation, the customer can send the products back to our company to repair, our company only charges the start detection fee of repair equipment (**yuan/unit) and the replaced components costs, the return and return shipping costs are all borne by the customer himself.
A tãŋuan,Lööŋ Repair(Wël kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k):
1. Kuen de akutnhom de ɣɔɔc, ni ye luui në kaam de garanti de kalite, kɔc ye ɣɔɔc alëu bïk kä ye ɣɔɔc lɔ̈ɔ̈m në akutnhom de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de ɣɔɔc de
2. N'a tɛ̈n yenë kä ye kek looi bɛ̈n ya looi ka tɛ̈n yenë kek looi ka tɛ̈n yenë kek looi ka tɛ̈n yenë kek looi ka tɛ̈n yenë kek looi ka tɛ̈n yenë kek looi ka tɛ̈n yenë kek looi ka tɛ̈n yenë kek looi ka tɛ̈
4.Terms of Service:
1. Në kaam de kä ye kek looi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi, ka kɔc cï luöi
2. Në kaam de garanti de käke, luɔɔi ye kɔc ye ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc ɣɔɔc
5.Tarif standard(Wël kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k kɔ̈k):
1. Kä ye kek ɣaac: Kä ye kek ɣaac ye kek ɣaac ye kek ɣaac ye kek ɣaac ye kek ɣaac ye kek ɣaac ye kek ɣaac ye kek ɣaac ye kek ɣaac ye kek ɣaac ye kek ɣaac ye kek ɣaac ye kek ɣaac ye kek ɣaac.
2. Kuen de luɔɔi: Kuen de luɔɔi de hardware *** yuan / man / day, Kuen de luɔɔi de software *** yuan / man / day, Kuen de kɔnɔ *** yuan / man / day (Kuen de kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔn
6.Wakt jaab:
1. Të yïn yök raan kɔnɔ wɛ̈t kɔnɔ wɛ̈t kɔnɔ wɛ̈t kɔnɔ wɛ̈t kɔnɔ wɛ̈t kɔnɔ wɛ̈t kɔnɔ wɛ̈t kɔnɔ wɛ̈t kɔnɔ wɛ̈t kɔn
2.When you receive a customer's site technical support request, immediately do the relevant procedures and send it to the customer service department to arrange, to ensure that the customer's schedule is in 2 hours, and strictly according to the agreed time to go to the site (not counting the time in the journey), if there are special circumstances that cannot go to the site at the time (such as flight cancellation etc.), you should notify the customer in 2 hours.
3.When you receive the customer's side to repair the product, you should contact the customer within 4 hours of receiving the product to confirm the delivery status, understand the product defect reason, and send the repair department inspection and analysis within 8 hours to ensure 3 working days to repair finished, return to the customer, special circumstances cannot be repaired as scheduled return should notify the customer, and explain the delay reason, but the delay processing does not exceed five working days.
7.Lëk:
N'a fɛ̈ɛ̈r bï yïn yɛ̈ɛ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r d
1.When product repair please simultaneously support and return defective accessories and properly packaged, along with a list stating the product model, number, defect phenomena and the site technicians' contact methods. 1.When product repair please simultaneously support and return defective accessories and properly packaged, along with a list stating the product model, number, defect phenomena and the site technicians' contact methods.
2.When product return, please indicate the returned product recipient and contact details, so that our department can return after inspection and repair, when filling the return list, please keep the written worker intact, so that we can check, send, and archive. 2.When product return, please indicate the returned product recipient and contact details, so that our department can return after inspection and repair, when filling the return list, please keep the written worker intact, so that we can check, send N'a tɛ̈n ye raan dɛ̈t ye raan dɛ̈t ye raan dɛ̈t ye raan dɛ̈t ye raan dɛ̈t ye raan dɛ̈t ye raan dɛ̈t ye raan
3.After the product is returned and repaired, please telephone or phone at the right time to tell us the shipping date, shipping list and shipping unit, so that our company receives the first time after the product is returned and repaired.
4. Telephone after-sales service:, ,,
Post-Sales Service Reception Process Chart:
