Shanghai Boju Electronic Technology Co., Ltd. (Shanghai Boju Electronic Technology Co., Ltd.)
Kuæa>Proizvodi>Insulator boiling test box
Insulator boiling test box
Insulator boiling test box BZ-SF-15-ZLN Equipment overview: Also known as: insulator boiling test box, insulator boiling test box, lightning protector
Detalji proizvoda

Insulator boiling test packaging BZ-SF-15-ZLN

Equipment overview:

Also known as: insulator boiling test box, insulator boiling test box, lightning arrester boiling box

A lëu bï ya looi tënë insulator ye cɔl overhead line insulator ye cɔl nominal voltage ye 10KV (ye cɔl AC system ye cɔl porcelain or glass edge)

(a) kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r. A ye tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ Shanghai

BOS R & D looi test box, ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc

Tɔŋ. A bɛ luɔ̈ɔ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ Lɔ̈k sampol në thëm de koor

Ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u

Parameters teknis:

1. Temperature control: PLC analog PID control, touch screen setting RT + 10 ~ 100 ℃

2. Warming Time: Set 100 degrees, take about 120 minutes to reach; 2.

3. Thermostat control: tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ

4.Heating Slot Inside Dimension: 1300 × 600 × 700 (MM) ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr ye dɔɔr

5. Inner box material: SUS304 # high quality stainless steel, thickness 1.5mm;

6.Heating power: ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n

7. Evaporator: exhaust pipeline through cold and lack water reflux device; 7. evaporator: exhaust pipeline through cold and lack water reflux device;

7. Condensation evaporation: ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc ye kɔc

8.Tool bracket: 4 sets of high temperature insulator adjustable bracket.

9.Automatic water replenishment: use the upper and lower level meter to automatically add water (delay control automatic water replenishment function). 9.Automatic water replenishment: use the upper and lower level meter to automatically add water (delay control automatic water replenishment function);

10.Components: de-ionic water supplier device, hot water tank, cooling condensing device, evaporation return device, circulating mixing system.


Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!