CTCS-2 Level Train Control System
Train operation control system ye tɛ̈n töŋ de teknoloji ye yen looi në China ye yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen yen Ha Lei Time acï bɛ̈n ya luui në teknoloji de CTCS-2 level train operation control system ye cɔl digestive absorption ku independent research and development.
Hetime CTCS-2 train operation control system adopts quasi-mobile closure method, based on track circuit and point information equipment to transmit information, satisfying the operational needs of 200~250Km/h lines, and at the same time satisfying the operational needs as 300Km/h and above lines CTCS-3 level reserve mode. Hetime CTCS-2 train operation control system adopts quasi-mobile closure method, based on track circuit and point information equipment to transmit information, satisfying the operational needs of 200~250Km/h lines, and at the same time satisfying the operational needs as 300 Sisitɛm de ATP, TCC, TSRS, LEU, TC, Balise, BTM, etc. ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈
Features ye
-
Ka tɛmɛ quasi-move closure
-
Lɔ̈ɔ̈m de luɔɔi ye kɔɔr në 300Km/h ku jɔl ya CTCS-3 level backup mode
CTCS-2 ye tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈
-
Ka tɛ̈n yenë kɔc wïc në 200-250Km/h
Company CTCS-2 train operation control system adopts quasi-mobile closure method, based on track circuit and point information equipment to transmit information, satisfying 200~250Km/h line operation needs. CTCS-2 train operation control system adopts quasi-mobile closure method, based on track circuit and point information equipment to transmit information, satisfying 200~250Km/h line operation needs.
